MSAMM
Back to course

Oracle Fusion Technical: Reports, Data, Integrations and Extensions · Module 18 · Capstone: one technical work package, end to end

Building it

Lesson 174 of 177 · 2 min

Work through the four requirements with the tools chosen in Module 3, and RECORD WHY EACH CHOICE WAS MADE. The recording is not documentation for its own sake. Six months from now somebody will ask why the statement was built in BI Publisher rather than OTBI, and the answer — the bank specifies the layout — is the difference between a considered design and one that looks arbitrary. One sentence per choice, written at the time. Build in the order from Lesson 2, and resist the temptation to start with the interesting one. The blocking pieces first, however small and however dull. Apply the habits each module built rather than rediscovering them. The one-row test before the full load. The bursting run to a directory before any delivery. The report run as a real end user rather than as yourself. The count in the interface tables before the import. Every

The full lesson is part of the course

The video, the complete written lesson and the module quiz are included in Oracle Fusion Technical: Reports, Data, Integrations and Extensions, with a certificate on completion and a fourteen-day refund window.

Get the free lessons by email

We will email you a link to every free lesson in this course. No account needed, and one message only.

In this module: Module 18 · Capstone: one technical work package, end to end

  1. 1The brief
  2. 2Sequencing the work
  3. 3Building it
  4. 4Proving it
  5. 5Handing it over
  6. 6Where to go next
Building it — Oracle Fusion Technical: Reports, Data, Integrations and Extensions — MSAMM