Oracle Integration Cloud: Building Integrations That Survive Production · Module 17 · Quarterly updates and OIC
A regression pack for integrations
Lesson 166 of 175 · 2 min
WHICH flows to re-run, with WHAT data, and how to keep the pack SMALL ENOUGH THAT SOMEBODY ACTUALLY RUNS IT. The size constraint is the design constraint, and stating it first is what makes this lesson practical. A regression pack covering thirty integrations takes two days, so it is skipped in the update window, so the estate has no regression testing at all. A pack of six flows that takes two hours gets run every quarter, and that is worth more than a thorough pack that is never executed. CHOOSE BY CONSEQUENCE, NOT BY COVERAGE. The flows that move money. The flows a partner depends on contractually. The flows whose failure is silent — per Module 13, those are the ones where a defect runs longest. An integration whose failure is loud and cheap does not need to be in the pack, because you will find out anyway, within the…
The full lesson is part of the course
The video, the complete written lesson and the module quiz are included in Oracle Integration Cloud: Building Integrations That Survive Production, with a certificate on completion and a fourteen-day refund window.
