Oracle Fusion Technical: Reports, Data, Integrations and Extensions · Module 16 · Environment management: P2T, refreshes and what breaks

The checklist before anybody clicks

Lesson 157 of 177 · 2 min · Free preview

A refresh started without this is how a week of unreleased configuration disappears. The checklist is short and every line is there because somebody lost something. EXPORT FIRST. Configuration built in the target since the last refresh, as a configuration package. List the settings that packages do NOT capture — Lesson 5 — and record them by hand. Take a note of role assignments made in the target, which will be replaced by production's. TELL PEOPLE, AND TELL THEM WHAT THEY LOSE. Everybody with work in that environment: testers mid-cycle, anybody holding an open sandbox, anybody whose test data is about to vanish. "The environment will be refreshed on Saturday" is not enough — say "anything you have built or entered there since the last refresh will be gone", because that is the sentence that makes people act. VERIFY BEFORE, NOT AFTER. Confirm the export completed and can be opened.

This lesson is free

Watch the full lesson, with its written notes, without an account. It is one of the free lessons this course opens with.

Watch the full lesson

Get the free lessons by email

We will email you a link to every free lesson in this course. No account needed, and one message only.

In this module: Module 16 · Environment management: P2T, refreshes and what breaks

  1. 1The environments, and what each is for
  2. 2What a P2T actually copies
  3. 3The checklist before anybody clicksFree preview
  4. 4Data masking and why it is not optional
  5. 5Preserving configuration across a refresh
  6. 6Integrations after a refresh
  7. 7Scheduling refreshes around a project
  8. 8What breaks: four refresh failures
  9. 9Lab briefing · Plan a refresh you could defend