Running a two-day pilot

Lesson 58 of 188 · 3 min · Free preview

Preparation, the week before: environment built, one real product configured end to end, stock on hand, cost setup done. And a rehearsal run, alone, so that nothing fails live. A pilot that breaks on screen loses more credibility than not running one. You are inviting the plant to watch the new system work; if it does not work, you have not run a neutral session — you have actively damaged the project's credibility, and you will not get a second one. Who attends: an operator, a supervisor, the materials manager, the engineer who owns the BOM, and the controller — the controller especially, because costing objections found on day two are cheap and found in UAT they are not. Day one: walk the master data. Show the item, the structure, the work definition. Ask "is this how you actually make it?" repeatedly, and write down every "well, not quite." Every

This lesson is free

Watch the full lesson, with its written notes, without an account. It is one of the free lessons this course opens with.

Watch the full lesson

Get the free lessons by email

We will email you a link to every free lesson in this course. No account needed, and one message only.

In this module: Module 6 · Quick Setup and the Conference Room Pilot

  1. 1Why we built it manually first
  2. 2What quick setup covers
  3. 3Facilities quick setup
  4. 4Verifying what it built
  5. 5The conference room pilot as a techniqueFree preview
  6. 6Running a two-day pilotFree preview
  7. 7What breaks
  8. 8Lab: build it fast, then plan the pilot