Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order · Module 15 · Cost Accounting Structures
What we are building
Lesson 146 of 188 · 1 min
A work order, its full cost breakdown, and the journal entries that came out the other side. That is the last link of the map you drew in the landscape module — the point where physical events become accounting. Seven links: cost organization, cost book, relationship, elements and components, valuation structure, cost profile, first costed transaction. Same shape as every flagship in this course, and the failure appears at the far end. This is the longest module of this phase and one of three flagships, and the reason is the next lesson. What to have open: your environment, the design template, and ideally the client's chart of accounts — which is not optional dressing, because half the decisions in this module land in somebody's general ledger.
The full lesson is part of the course
The video, the complete written lesson and the module quiz are included in Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order, with a certificate on completion and a fourteen-day refund window.
In this module: Module 15 · Cost Accounting Structures
- 1What we are building
- 2The warning nobody readsFree preview
- 3The costing object model
- 4Choosing a cost method
- 5Cost organization design
- 6Running the costing design workshop
- 7Cost organizations and cost books
- 8Cost organization relationships
- 9Cost elements and components
- 10Cost component mappings
- 11Valuation structures and units
- 12Cost profiles
- 13Expense pools and accounting
- 14Quick setup for cost accounting
- 15What breaks
- 16Lab briefing: the Halden costing design
- 17Lab solution walkthrough
