MSAMM
Back to course

Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order · Module 16 · Cost Planning

Resource rates

Lesson 166 of 188 · 13 min

Open Manage Resource Rates and create. Select the scenario, the plant and the resource, add a detail row with cost element, expense pool and rate, and set rates for the labour and equipment resources. Then show a resource with no rate, and the consequence, and verify against the resources list. A resource with no rate contributes nothing to cost. The roll-up succeeds and the cost is silently understated. Check every resource has a rate before rolling up — that verification is the first acceptance criterion in the lab. Rates come from Finance — a fully loaded labour rate, a machine rate including depreciation and power. They are not something you estimate. Rates are per plant. Two plants with different labour costs need two sets.

The full lesson is part of the course

The video, the complete written lesson and the module quiz are included in Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order, with a certificate on completion and a fourteen-day refund window.

Get the free lessons by email

We will email you a link to every free lesson in this course. No account needed, and one message only.

In this module: Module 16 · Cost Planning

  1. 1What a standard cost is made of
  2. 2Cost scenarios
  3. 3Standard costs for materials
  4. 4Resource rates
  5. 5Overhead rates
  6. 6Rolling up costs
  7. 7Analysing the rolled-up cost
  8. 8Updating and publishing costs
  9. 9What breaks
  10. 10Lab: roll it up and publish
Resource rates — Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order — MSAMM