Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order · Module 16 · Cost Planning
Rolling up costs
Lesson 168 of 188 · 14 min
Open the scenario and from Actions select roll up costs. Tick the notify-on-completion option, submit and monitor. Review the result for a purchased item, then a single-level manufactured item, then the multi-level assembly, and show the cost building through the levels. Then show a roll-up that fails or produces a zero cost, and diagnose it. The multi-level roll-up is the payoff of the structures, resources, work definitions and cost structures modules together. Walk it level by level — this is the moment four modules of master data produce a number. Watch for zero costs. A zero-cost component silently understates everything above it. The roll-up is a batch process. On a large item master it takes time. Plan for it in the annual cycle.
The full lesson is part of the course
The video, the complete written lesson and the module quiz are included in Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order, with a certificate on completion and a fourteen-day refund window.
