Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order · Module 12 · Receiving

Routing: standard, inspection, direct

Lesson 121 of 188 · 14 min

Direct delivery receives straight into the destination subinventory: one step, fastest, no intermediate control. Standard receipt receives into a receiving area, then puts away as a separate step, giving control over where things end up and a staging area. Inspection required receives, inspects, then accepts or rejects before putaway. How to choose. Direct for trusted, high-volume, low-risk material. Standard where the dock and the stores are physically separate. Inspection for quality-critical, regulated, or new-supplier material. Routing can be set at several levels — organization default, item, supplier. The supplier level is the one people do not know exists, and it is exactly right for "new supplier, inspect everything for six months". Then build all three routings, set an item to require inspection, and show the resulting behaviour difference on receipt. Inspection routing on everything is a common over-control that clogs the dock. Ask what genuinely needs it. It is the

The full lesson is part of the course

The video, the complete written lesson and the module quiz are included in Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order, with a certificate on completion and a fourteen-day refund window.

Get the free lessons by email

We will email you a link to every free lesson in this course. No account needed, and one message only.

In this module: Module 12 · Receiving

  1. 1The receiving flow
  2. 2Receiving parameters
  3. 3Routing: standard, inspection, direct
  4. 4Receiving material
  5. 5Inspection and putaway
  6. 6Returns and corrections
  7. 7What breaks
  8. 8Lab: three routings and a rejection