MSAMM
Back to course

Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order · Module 12 · Receiving

Receiving parameters

Lesson 120 of 188 · 12 min

Open receiving parameters for the organization, set the default routing, set over-receipt and early or late receipt tolerances and the action on breach, set receipt number generation, set the default receiving subinventory and locator, save, and repeat for the second organization. Tolerances are a control the client must decide. How much over-delivery do you accept without approval? Ask the materials manager and the controller. They will give different answers, and both need to hear the other — that is the meeting, not two separate conversations. Action on breach — warn or reject — is a culture decision. Reject stops the receiving dock. Warn lets things through. Put it in those terms; it makes the trade-off concrete for a client who would otherwise pick "reject" because it sounds rigorous.

The full lesson is part of the course

The video, the complete written lesson and the module quiz are included in Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order, with a certificate on completion and a fourteen-day refund window.

Get the free lessons by email

We will email you a link to every free lesson in this course. No account needed, and one message only.

In this module: Module 12 · Receiving

  1. 1The receiving flow
  2. 2Receiving parameters
  3. 3Routing: standard, inspection, direct
  4. 4Receiving material
  5. 5Inspection and putaway
  6. 6Returns and corrections
  7. 7What breaks
  8. 8Lab: three routings and a rejection