MSAMM
Back to course

Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order · Module 12 · Receiving

Lab: three routings and a rejection

Lesson 126 of 188 · 2 min

Forty-five minutes. Receiving parameters configured for both plants, with justified tolerances — justified, meaning you took a position on how much over-delivery is acceptable and on whether breach warns or rejects. All three routings configured, with a written policy on which material gets which. One item set to require inspection, justified. Receipts executed under each routing. An inspection with partial acceptance, and rejected material routed to quarantine. One over-receipt hitting the tolerance. One receipt correction and one supplier return. And evidence: material visible in the receiving area before putaway, and in stock after. Four acceptance criteria, and the first is written to catch a specific answer. The routing policy is specific, not "inspection for everything". That is the safe answer, it passes every internal review, and it is one of the failure cases. If your policy inspects everything, you have made a decision that fills a dock — so make

The full lesson is part of the course

The video, the complete written lesson and the module quiz are included in Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order, with a certificate on completion and a fourteen-day refund window.

Get the free lessons by email

We will email you a link to every free lesson in this course. No account needed, and one message only.

In this module: Module 12 · Receiving

  1. 1The receiving flow
  2. 2Receiving parameters
  3. 3Routing: standard, inspection, direct
  4. 4Receiving material
  5. 5Inspection and putaway
  6. 6Returns and corrections
  7. 7What breaks
  8. 8Lab: three routings and a rejection