MSAMM
Back to course

Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order · Module 10 · Work Definitions

Operation resources

Lesson 101 of 188 · 13 min

Assign resources to operations, set usage rate and basis — per unit or per batch — set the resource as scheduled or not, set the principal resource where several are used, show the resulting operation duration calculation, then change a usage rate and show the schedule change. Basis is where errors hide. Per-unit setup time on a thousand-unit order is a thousand setups. Setup is per batch; run time is per unit. Get this wrong and both schedule and cost are wildly out — and it is the most spectacular failure in the module, because a two-day job becomes three weeks. Non-scheduled resources still charge cost but do not consume capacity, which is useful for supervision or inspection. Do the duration arithmetic on screen.

The full lesson is part of the course

The video, the complete written lesson and the module quiz are included in Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order, with a certificate on completion and a fourteen-day refund window.

Get the free lessons by email

We will email you a link to every free lesson in this course. No account needed, and one message only.

In this module: Module 10 · Work Definitions

  1. 1The manufacturing model decisionFree preview
  2. 2What a work definition contains
  3. 3Work definition names and versions
  4. 4Building operations
  5. 5Operation items and supply types
  6. 6Operation resources
  7. 7Validating against the shop floor
  8. 8Outside processing
  9. 9Loading work definitions in bulk
  10. 10Costing implications
  11. 11What breaks
  12. 12Lab: build the route the plant actually runs