Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order · Module 10 · Work Definitions
Lab: build the route the plant actually runs
Lesson 107 of 188 · 3 min
Ninety minutes. Listen to this scenario carefully — several of its sentences are the acceptance criteria in disguise. The Bergen finished assembly goes through: preparation, welding, machining, an outside plating operation at a local supplier, assembly, and final inspection. Welding uses two welders and a welding station. Machining setup takes forty-five minutes regardless of quantity. Run time is six minutes per unit. Fasteners and sealant are consumed continuously and reliably. The hydraulic actuator is expensive, serialized, and fitted at assembly. And inspection is performed — but has never appeared on any process document. The supervisor mentioned it in passing. Four things in there, each mapping to a lesson. "Setup takes forty-five minutes regardless of quantity; run time is six minutes per unit" is the basis decision, with the numbers supplied so you can verify by hand — the acceptance criteria check a two-hundred-unit order, so do that arithmetic on paper…
The full lesson is part of the course
The video, the complete written lesson and the module quiz are included in Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order, with a certificate on completion and a fourteen-day refund window.
In this module: Module 10 · Work Definitions
- 1The manufacturing model decisionFree preview
- 2What a work definition contains
- 3Work definition names and versions
- 4Building operations
- 5Operation items and supply types
- 6Operation resources
- 7Validating against the shop floor
- 8Outside processing
- 9Loading work definitions in bulk
- 10Costing implications
- 11What breaks
- 12Lab: build the route the plant actually runs
