MSAMM
Back to course

Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order · Module 8 · Item Structures

Loading structures in bulk

Lesson 84 of 188 · 11 min

Prepare a structure load file from the course pack, load a small set and verify. Introduce three seeded errors — component item missing, circular reference, invalid effectivity — and show each rejection. Correct and reload, load the full pack, then verify with an indented structure view and a component count. Items must load before structures. Sequence matters here exactly as it does in every other loading exercise in this course. Circular references — a part that contains itself, directly or indirectly — are a real and confusing failure. Trace them with where-used. Verify by looking at a multi-level indented view, not just a count. A count that matches proves the rows arrived; it does not prove they arrived in the right shape.

The full lesson is part of the course

The video, the complete written lesson and the module quiz are included in Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order, with a certificate on completion and a fourteen-day refund window.

Get the free lessons by email

We will email you a link to every free lesson in this course. No account needed, and one message only.

In this module: Module 8 · Item Structures

  1. 1What a structure is and is not
  2. 2Structure names and effectivity control
  3. 3Creating a structure
  4. 4Components, quantities, yield and scrap
  5. 5Multi-level structures and phantoms
  6. 6Substitutes and reference designators
  7. 7Loading structures in bulk
  8. 8What breaks
  9. 9Lab: three levels, with yield