MSAMM
Back to course

Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order · Module 8 · Item Structures

Components, quantities, yield and scrap

Lesson 81 of 188 · 13 min

Set the component quantity per assembly, set the unit of measure and show a conversion in action — the units module's payoff. Configure component yield, and explain the difference from scrap. Set the supply type — the work definitions module uses it — set optional and required components, and show the effect of yield on required quantity, with the arithmetic on screen. Yield is the attribute nobody sets and everybody needs. If you scrap three per cent of a component during assembly, the system must plan and cost for a hundred and three per cent — or you run short every time, and your standard cost is wrong. Both consequences; the second is the one that reaches Finance. Supply type determines whether material is pushed to the work order or backflushed on completion. It is a shop floor process decision, not a system default. Ask the operators. Do the yield

The full lesson is part of the course

The video, the complete written lesson and the module quiz are included in Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order, with a certificate on completion and a fourteen-day refund window.

Get the free lessons by email

We will email you a link to every free lesson in this course. No account needed, and one message only.

In this module: Module 8 · Item Structures

  1. 1What a structure is and is not
  2. 2Structure names and effectivity control
  3. 3Creating a structure
  4. 4Components, quantities, yield and scrap
  5. 5Multi-level structures and phantoms
  6. 6Substitutes and reference designators
  7. 7Loading structures in bulk
  8. 8What breaks
  9. 9Lab: three levels, with yield