Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order · Module 8 · Item Structures
Lab: three levels, with yield
Lesson 86 of 188 · 2 min
An hour, against a Halden finished assembly. A three-level structure: finished good, two sub-assemblies, purchased components. Yield configured on at least two components, with realistic loss percentages — realistic, because three per cent on a gasket is realistic and forty is not, and the acceptance criteria include hand-verifying the arithmetic. Supply types set deliberately, with a written note on which are backflushed and why — deliberately, which means the note is the deliverable and the setting is the consequence. One phantom item, with a justification. One substitute component with priority. Structures loaded in bulk from the pack, with all three seeded errors diagnosed. Evidence: an indented multi-level view, and a where-used view from a shared component. And the last one, which is unusual: a written note distinguishing which parts of your structure came from engineering and which would need validating on the shop floor. That last criterion asks you to…
The full lesson is part of the course
The video, the complete written lesson and the module quiz are included in Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order, with a certificate on completion and a fourteen-day refund window.
