MSAMM
Back to course

Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order · Module 7 · Items and the Item Model

Data quality before migration

Lesson 74 of 188 · 3 min · Free preview

The client's item data is worse than they think. Said bluntly rather than diplomatically, because the diplomatic version does not get acted on. This is true on essentially every manufacturing implementation, and it is better to say it in week two than to discover it in test cycle two. The common defects. Duplicate parts under different numbers. Obsolete items nobody has flagged — often twenty to forty per cent of the master. That is not a typo: up to two items in five. Missing or wrong units of measure. Descriptions that are free text with no convention. Attributes held in spreadsheets outside the legacy system — which means the extract is not the data, and nobody will mention this until you ask. And parts referenced on BOMs that do not exist in the item master. The assessment to run, in week two: counts by type, duplicate detection on description similarity,

This lesson is free

Watch the full lesson, with its written notes, without an account. It is one of the free lessons this course opens with.

Watch the full lesson

Get the free lessons by email

We will email you a link to every free lesson in this course. No account needed, and one message only.

In this module: Module 7 · Items and the Item Model

  1. 1What we are building
  2. 2Why the item model is permanent
  3. 3The item object model
  4. 4Master versus organization attributes
  5. 5Designing the class hierarchy
  6. 6Item numbering
  7. 7Building item classes
  8. 8Item templates
  9. 9Creating items manually
  10. 10The attributes that matter most
  11. 11Assigning items to organizations
  12. 12Item statuses and lifecycle phases
  13. 13Importing items in bulk
  14. 14Data quality before migrationFree preview
  15. 15What breaks
  16. 16Lab briefing: the Halden item model
  17. 17Lab solution walkthrough
Data quality before migration — Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order — MSAMM