MSAMM
Back to course

Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order · Module 7 · Items and the Item Model

Lab solution walkthrough

Lesson 77 of 188 · 18 min

The model built from empty, with the reasoning narrated. The sequence: the class hierarchy, designed out loud before anything is built, with the class count justified against the four workshop questions; the regulated attributes, worked both ways before choosing; the engineering and commercial split, implemented as class security; attribute control levels, with lead time at organization level and the reasoning stated; the numbering recommendation, with a position taken; then classes, templates, the five-hundred-item load, the four seeded errors, and organization assignment; the custom status and the phase-out scenario; and the data quality plan for the twelve-thousand-four-hundred-item extract. Name the defensible alternatives. The regulated attributes can go in a dedicated class or in an attribute group applied to existing classes, and both are reasonable. The numbering question has a defensible answer either way — though one is much easier to sell to a shop floor. And the close. The class hierarchy

The full lesson is part of the course

The video, the complete written lesson and the module quiz are included in Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order, with a certificate on completion and a fourteen-day refund window.

Get the free lessons by email

We will email you a link to every free lesson in this course. No account needed, and one message only.

In this module: Module 7 · Items and the Item Model

  1. 1What we are building
  2. 2Why the item model is permanent
  3. 3The item object model
  4. 4Master versus organization attributes
  5. 5Designing the class hierarchy
  6. 6Item numbering
  7. 7Building item classes
  8. 8Item templates
  9. 9Creating items manually
  10. 10The attributes that matter most
  11. 11Assigning items to organizations
  12. 12Item statuses and lifecycle phases
  13. 13Importing items in bulk
  14. 14Data quality before migrationFree preview
  15. 15What breaks
  16. 16Lab briefing: the Halden item model
  17. 17Lab solution walkthrough