MSAMM
Back to course

Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order · Module 7 · Items and the Item Model

Lab briefing: the Halden item model

Lesson 76 of 188 · 3 min

Two hours. Read this twice. Halden makes marine deck equipment. The catalogue splits into purchased components — fasteners, bearings, hydraulic parts, electrical — raw materials, steel plate and bar, bought by weight and consumed by length or piece; manufactured sub-components made at Skien; finished assemblies made at Bergen; and a small spare parts range sold directly. Engineering holds the design attributes and must be the only group able to change them. The commercial team maintains descriptions and sales attributes. Both teams currently edit the same spreadsheet and complain about each other. Legacy part numbers are eight characters, intelligent — the first two characters indicate the product family. Everyone on the shop floor knows them. Engineering has wanted to abandon the scheme for years. Lead times differ between Bergen and Skien for the same purchased components, because they use different local suppliers. Finished assemblies for two regulated export markets carry additional

The full lesson is part of the course

The video, the complete written lesson and the module quiz are included in Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order, with a certificate on completion and a fourteen-day refund window.

Get the free lessons by email

We will email you a link to every free lesson in this course. No account needed, and one message only.

In this module: Module 7 · Items and the Item Model

  1. 1What we are building
  2. 2Why the item model is permanent
  3. 3The item object model
  4. 4Master versus organization attributes
  5. 5Designing the class hierarchy
  6. 6Item numbering
  7. 7Building item classes
  8. 8Item templates
  9. 9Creating items manually
  10. 10The attributes that matter most
  11. 11Assigning items to organizations
  12. 12Item statuses and lifecycle phases
  13. 13Importing items in bulk
  14. 14Data quality before migrationFree preview
  15. 15What breaks
  16. 16Lab briefing: the Halden item model
  17. 17Lab solution walkthrough