Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order · Module 4 · Inventory Organizations and Plants
Enabling manufacturing on a plant
Lesson 38 of 188 · 9 min
Set the additional usage on Plant A to include manufacturing and show the manufacturing-specific parameters that appear. Repeat for Plant B, then show the warehouse organization deliberately left without manufacturing, and open a manufacturing work area to show only the two plants available. A manufacturing plant is an inventory organization with manufacturing enabled. That exact sentence resolves most of the confusion about the two terms, and it is the same sentence from the object model lesson — repetition is the point in a flagship module. Enabling manufacturing later is possible; plan it deliberately rather than discovering it. The warehouse being excluded is the point. The demonstration is the lesson, not a formality.
The full lesson is part of the course
The video, the complete written lesson and the module quiz are included in Implementing Manufacturing and Materials Management: From Empty Plant to Costed Work Order, with a certificate on completion and a fourteen-day refund window.
In this module: Module 4 · Inventory Organizations and Plants
- 1What we are building
- 2The decision you cannot undo
- 3The organization object model
- 4The item master organizationFree preview
- 5Organization granularity — how many?
- 6Running the facilities design workshop
- 7Four worked plant models
- 8Creating the item master organization
- 9Creating an inventory organization
- 10Organization parameters
- 11Enabling manufacturing on a plant
- 12Subinventory design
- 13Locators
- 14Inter-organization relationships
- 15Proving the structure works
- 16What breaks
- 17Lab briefing: the Halden Works structure
- 18Lab solution walkthrough
